Have any questions?
+44 1234 567 890
Strandmöllen AB purchases a 3 MW electrolyzer from FEST GmbH / Green-H2-Systems.
The electrolyzer is scheduled to be commissioned in July 2023. The electrolyzer consists of a containerized solution, which offers the possibility to expand its size and capacity over time. The main goal of the project is to reduce CO2 emissions from trucks. The electrolyzer is powered by green energy from local wind turbines.
The project is a natural extension of Strandmöllen's overall sustainability focus and is partly funded by the Swedish Environmental Protection Agency.
Source: STRANDMÖLLEN PURCHASES AN ELECTROLYSER FROM FEST GmbH (strandmollen.se)
